CMU HGC Mac Meeting 10 March 2026

News

  • [X] 200 CuT in here
  • [ ] Tiawan trip approval 23 – 25th
  • [ ] More Ti baseplates
  • [ ] Offer to Austin
  • MAC Meeting tomorrow

Aniket

  • 6 tempature sensors
  • Alarm output mostly done… need to connect to PLC
  • Debugging the Vitrex ordered some cables… Cant see.

Sam

  • HV cables for kiethely

Pritam

  • Lots of good progress!!
  • Taking a decent amoutn of time to cool down.
  • Sldies

https://docs.google.com/presentation/d/1ru_gz_5bvyI1F5D7DDCIaY1-TmVESH8dSURiSEkfhoU/edit?slide=id.p#slide=id.p

Jim

  • Goal for week to run one module through the steps log everything.
  • B C

Jessica

  • 19 moduels pretty good grades
  • Replace the Gantry camera ?

Jasques

  • 2nd over
  • 2k humidifier filters

Arvind

  • From scratch complete a module !
  • Tweak fiducial finding
  • Very hard to read the QR codes on the baseplates

Rain

  • Finished upgraded the common QC daskboards

Sindhu

  • Moduel QC summary uploads started
  • cleanup auto upload scripts

Christian

  • Rearaging in the shipping are
  • Extra PC /

MMTS

(1) ETA and items to complete for chiller checkout with the shelves.

  • Shleves need to be moved… waiting on UCSB
  • [ ] Dry air being installed now
  • [ ] Needed more fittings
  • [ ] Most of the sensors are mounted
  • [ ] Chiller connection
  • [ ] Magnetic door lock working
  • Chiller to shelves : compression fittings ordered for chamber to chiller connection, leak test should be

done in 10 days.

(2) ETA and items to complete for tray assembly (without Kria)

  • Have all components.
  • Build a tray

(3) Status on wiring, software, etc for IV curve tests

  • Andrew is ordering the wires and connectors. Connections should be done in 10-14 days as well. PLC side should be completed within 10-14 days as well.
  • PLC found a few parts which should arrive this week.
  • IV was done.. with single module GUI… HV switch