CMU HGC Mac Meeting 10 March 2026
News
[X]200 CuT in here[ ]Tiawan trip approval 23 – 25th[ ]More Ti baseplates[ ]Offer to Austin- MAC Meeting tomorrow
Aniket
- 6 tempature sensors
- Alarm output mostly done… need to connect to PLC
- Debugging the Vitrex ordered some cables… Cant see.
Sam
- HV cables for kiethely
Pritam
- Lots of good progress!!
- Taking a decent amoutn of time to cool down.
- Sldies
Jim
- Goal for week to run one module through the steps log everything.
- B C
Jessica
- 19 moduels pretty good grades
- Replace the Gantry camera ?
Jasques
- 2nd over
- 2k humidifier filters
Arvind
- From scratch complete a module !
- Tweak fiducial finding
- Very hard to read the QR codes on the baseplates
Rain
- Finished upgraded the common QC daskboards
Sindhu
- Moduel QC summary uploads started
- cleanup auto upload scripts
Christian
- Rearaging in the shipping are
- Extra PC /
MMTS
(1) ETA and items to complete for chiller checkout with the shelves.
- Shleves need to be moved… waiting on UCSB
[ ]Dry air being installed now[ ]Needed more fittings[ ]Most of the sensors are mounted[ ]Chiller connection[ ]Magnetic door lock working- Chiller to shelves : compression fittings ordered for chamber to chiller connection, leak test should be
done in 10 days.
(2) ETA and items to complete for tray assembly (without Kria)
- Have all components.
- Build a tray
(3) Status on wiring, software, etc for IV curve tests
- Andrew is ordering the wires and connectors. Connections should be done in 10-14 days as well. PLC side should be completed within 10-14 days as well.
- PLC found a few parts which should arrive this week.
- IV was done.. with single module GUI… HV switch