CMU HGC Mac Meeting 1 July 2025
News:
- Lab is dry
- Bunch of sensors arrived / (Think about it…)
- Boards on hold in FNAL
- Baseplates /Sensor incoming
Action
[X] Tranfer tape
[X] Ordering tape and boxes
[ ] Crates ?
[X] MMTS
Jessica
- Before lab underwater…
- Glue study:
- One syringe per four modules
- Consummables OK for rampup
- And/ON light installed
- How to deal with water….?
Discussion…
Gullia
- Testing edge cases on mini-gantry
- When gantry runs… timing.
Jim
- Mounted the new air drier
- Working with Joy on shipping container
- Will design the wooden crate $300
Josh
- Programming with Jacques
- Related to the camera: should create camera specific program
Jacques
- Progress on 2 slot encapsulation
- Dealt with the incoming Si
Joyce
- with florin. Got server to be able to send to contact point.
Andrew
- Foam still pending
- Acceleremeter
Pritam
- All MMTS components arrived. Will ship to TTU and UCSB.
Sindhu
- Can upload module data
- New errors with other tables
- Suggest unit tests
- If tables look good
Joy
- Working with Jim installing into the crate
- Shock log… Order tilt indicator