CMU HGC Mac Meeting 3 March 2026

News

  • [ ] 200 CuT in here
  • [ ] Tiawan trip approval 23 – 25th
  • [ ] More Ti baseplates
  • [ ] 12 modules yesturday
  • [ ] Offer to Austin
  • MAC Meeting tomorrow

Action

  • Meeting:
    • CuT need to assemble within a year
    • 100 + 200um Si
    • Continue Ti + 300 v3d
  • MMTS:

MMTS

(1) ETA and items to complete for chiller checkout with the shelves.

  • Shleves need to be moved… waiting on UCSB
  • [ ] Dry air being installed now
  • [ ] Needed more fittings
  • [ ] Most of the sensors are mounted
  • [ ] Chiller connection
  • [ ] Magnetic door lock working
  • Chiller to shelves : compression fittings ordered for chamber to chiller connection, leak test should be

done in 10 days.

(2) ETA and items to complete for tray assembly (without Kria)

  • Have all components.
  • Build a tray

(3) Status on wiring, software, etc for IV curve tests

  • Andrew is ordering the wires and connectors. Connections should be done in 10-14 days as well. PLC side should be completed within 10-14 days as well.
  • PLC found a few parts which should arrive this week.
  • IV was done.. with single module GUI… HV switch

Jessica

  • Tightening up the fiducial finding
  • Moving along nicely
  • Mini Gantry camera throwing errors
  • SB sees the same

Sindhu

  • Working with TTU to rename the 300 um to 200 um
  • Updated in their postgres system (and lxplus)
  • Struggling with uploads to cmsrw

Rain

  • Figured out a way to get the grapha of all macs to show up

Christian

  • No real updates for this week.
  • Organzing the shipping area.