CMU HGC Mac Meeting 3 March 2026
News
[ ]200 CuT in here[ ]Tiawan trip approval 23 – 25th[ ]More Ti baseplates[ ]12 modules yesturday[ ]Offer to Austin- MAC Meeting tomorrow
Action
- Meeting:
- CuT need to assemble within a year
- 100 + 200um Si
- Continue Ti + 300 v3d
- MMTS:
MMTS
(1) ETA and items to complete for chiller checkout with the shelves.
- Shleves need to be moved… waiting on UCSB
[ ]Dry air being installed now[ ]Needed more fittings[ ]Most of the sensors are mounted[ ]Chiller connection[ ]Magnetic door lock working- Chiller to shelves : compression fittings ordered for chamber to chiller connection, leak test should be
done in 10 days.
(2) ETA and items to complete for tray assembly (without Kria)
- Have all components.
- Build a tray
(3) Status on wiring, software, etc for IV curve tests
- Andrew is ordering the wires and connectors. Connections should be done in 10-14 days as well. PLC side should be completed within 10-14 days as well.
- PLC found a few parts which should arrive this week.
- IV was done.. with single module GUI… HV switch
Jessica
- Tightening up the fiducial finding
- Moving along nicely
- Mini Gantry camera throwing errors
- SB sees the same
Sindhu
- Working with TTU to rename the 300 um to 200 um
- Updated in their postgres system (and lxplus)
- Struggling with uploads to cmsrw
Rain
- Figured out a way to get the grapha of all macs to show up
Christian
- No real updates for this week.
- Organzing the shipping area.