CMU MAC Meeting 13 May 2025
News
- Andrew away
- Carter / Rain / Guillia and Joyce
- Carter and Joyce
- Julia mini gantry camera
- Seth is ordering everything as fabricated equipment
- MAC meeting tomorrow
Unistrut: Plan upgraded.
- One unistrut to try: order 3 more
- Too heavy… changed planning.
- New plan… $48
Action
- Plan on personnel…Jim to do Gantry
- Transfer tape ? … Seth putting them in the system
- Waiting on power from FMS
- Humidity ? Units $1600
Follow up with FMS re:humidity (Jeff Harris)
Order Boxes?
Order Crates?
Order MMTS
Test the chillers
Pritam
- I am waiting for the FMS installation of the power connection for the chiller.
- Vitrek needed the wiring information for the switch, I have given the information last week and since then me and Seth did not hear anything back from them. I will check with Seth once again tomorrow.
Jessica
- Getting ready to do dummy runs
- Some changes in Labveiw
- Holding up: bellows o-ring failure / super glue to keep them in.
- Looking into Spareparts
- Dry pick and place the rest of the weekly…Dummy assembly Monday
- Need cleaning after unistrut
- Temp and Humidity git-hub
- Particulate counter next
Josh
- Email re:encapsulate consistent programs CMU and UCSB
- Transport box: end of the week TechSpark
- Jim to do the Gantry
Jim
- anon light:
- Overhead stuff has risk
- Guidlines for mounting
- Protect production at all costs: Nothing heavy
- Has solid works
Sindhu
- Working on assembly conditions to upload
Guillia
- Continuing mini-Gantry work
- Camera on the mini-Gantry for bond
Valentina
Joyce
- Just started
- Testing modules with Andrew
Manami
- Bonder XML is upload-able to central DB
- Cure time missing in Local DB
- Central DB has version control for hexaboard
- Pedalstool test XML may take longer
- Table at CERN different
- One ROC data per XML
Manfred
- New undergrads lab saftery course