Modules Summary April 2026
At UCSB, the production of modules is ongoing (see counts below). Lots of work on the MMTS, installed the additional of a membrane dryer, this reaches the target dew point
At CMU, the production of modules is ongoing (see counts below). We have been prioritizing MMTS work, so assembly has proceeded at a somewhat reduced pace with 1-2 FTE less than during regular production periods . We have encountered the same dew point problems as UCSB, and will also purchace the membrane dryer to get the dew point down.
Modules assembled at CMU during 2026/4 –
| Geometry | Resolution | BP Material | Sensor Thickness | ROC Version | Final Grade | Count |
| Full | LD | CuW | 200 | HGCROCV3d | 34 | |
| Full | LD | CuW | 200 | HGCROCV3d | A | 8 |
| Full | LD | CuW | 200 | HGCROCV3d | C | 5 |
| Full | LD | CuW | 200 | HGCROCV3d | B | 1 |
Modules assembled at TTU during 2026/4 –
| Geometry | Resolution | BP Material | Sensor Thickness | ROC Version | Final Grade | Count |
| Full | LD | CuW | 200 | HGCROCV3d | A | 62 |
| Full | LD | Titanium | 300 | HGCROCV3d | A | 12 |
| Full | LD | Titanium | 300 | HGCROCV3d | 12 | |
| Full | LD | CuW | 200 | HGCROCV3d | 5 |
Modules assembled at UCSB during 2026/4 –
| Geometry | Resolution | BP Material | Sensor Thickness | ROC Version | Final Grade | Count |
| Bottom | LD | Titanium | 300 | HGCROCV3d | A | 33 |
| Left | LD | Titanium | 300 | HGCROCV3d | 23 | |
| Full | HD | Titanium | 200 | HGCROCV3d | A | 5 |
| Bottom | LD | Titanium | 300 | HGCROCV3d | B | 4 |
| Bottom | LD | Titanium | 300 | HGCROCV3d | F | 1 |
| Full | HD | Titanium | 200 | HGCROCV3d | F | 1 |
| Left | LD | Titanium | 300 | HGCROCV3d | A | 1 |