22 August 2025 Friday

Time Block

   
9 Migrating code
  Migrating code
10 CL. CV and statment
  MPL Meeting
11 Chat AE
  Chuyauan Material
12 Hoops
  Hoops
1 Hoops
  Chat Rienhard
2 Working out Modules numbers
  Graphana / email
3 bbWW
  bbWW
4  
  DOE Chat

W: 6 DW: 4 OT: 2 ex

The One Thing:

FInish merging head Setup bbWW

Up at 7

T to school.

Summer 2025

Create Fall 2025… actually dont need it until next week

Testing new coffea4bs code

  • run from main directory: /run_container python runner.py -o histMixedData.coffea -d mixeddata -p python/analysis/processors/processor_HH4b.py -y 2018 -op output/ -m python/metadata/datasets_HH4b.yml -c python/analysis/metadata/HH4b_nottcheck.yml
  • and the debug script ./run_container python python/analysis/debugMixedData.py python/output//histMixedData.coffea

Magit Magit in emacs

  • can delete braches with b k

Update local coffea4bs

  • all good

Reviewing Chuyuan Liu docs

Hoops

  • 5s and 4s
  • played OK

Chat Reinhard

Ping Roberts re:shipping 8 good Ti3c modules to FNAL

Pinged Sindhu et al re: Graphana

Total modules needed for Harry

According to google docs for BOE

For working modules (not including the testbeam modules) I have 12,780

CMU: 240 (pre-production) + 3696 (production) = 3936 TTU: 240 (pre-production) + 3696 (production) = 3936 UCSB: 159 (Full-size equivalent preproduction) + 234 (Half-size equivalent) + 2379 (FSE production) + 2136 (HSE production) = 4908 Total: 12780

Setting up coffeabbWW

  • See above

DOE chat

  • At page limit… need to add ~2 pages
  • MP: HGC DQM -> ECAL section
  • MP+JA: Integration & Installation toward commissioning 2.4.3
  • MP: 4-top
  • Physics section: describe what we want to do. ~no background / not a summary of past work
  • Try to kill where you can
  • Update collaborator list
  • Will meet Monday at 2pm

Home with T

Dinner

Marlo Birthday Celebrations

2025-08-25_08-21-12_screenshot.png

Reading